METER INSTALLATION CHARGES
Includes Meter Deposit
Cost will vary depending on meter size
requested, and
the water mains relationship to the new meter being installed.
Listed below are typical cost for residential applications.
SAME SIDE SINGLE CONNECTION
Meter to be installed on same side of County or State Road as water main.
5/8” - $995.00
1” - $1,225.00
2” – to be determined
-------------------------------------------------
SAME SIDE DOUBLE CONNECTION
Meter to be installed on same side of County or State Road as water main.
5/8''
$1,360.00
others unavailable
-------------------------------------------------
OPPOSITE SIDE SINGLE CONNECTION
Meter to be installed on opposite side of County or State road from water main.
5/8” - $1,135.00
1” - $1,345.00
2” – to be determined
------------------------------------------------
OPPOSITE SIDE DOUBLE CONNECTION
Meter to be installed on opposite side of County or State road from water main.
5/8” - $1,470.00
others unavailable
------------------------------------------------
CONNECTION REQUIRING STATE HIGHWAY BORE
Same costs as above plus $30.00 per foot or current contractor rate.
------------------------------------------------
METER DEPOSIT CHARGE
$50.00 if the applicant is the owner of the property served.
$75.00 if the applicant is a renter of the property served.
This deposit will be applied to the customer’s final bill when the account is
closed.
If no balance is due, the deposit will be refunded to the customer.
------------------------------------------------
NORTH GARLAND COUNTY REGIONAL WATER DISTRICT
“A COMMUNITY SERVICE ORGANIZATION”
138 Cedar Mountain Circle
Hot Springs, AR 71909
(501) 620-4118